FOUNDATION:

ELEVATED Post & Pad FOUNDATION (flood zone, undulating, or sloping terrain):​​

  • Pad – 4’ X 4’ built with treated 4” X 12” timber

  • Post – 6” X 6” treated timber

  • Beam – 3-1/2” and 5-1/8” X (Varies) Glu-lam

  • Lateral Brace – 2” X 6” treated lumber

  • Connections – powder-coated ¼” welded steel

  • Fasteners – Hot-dipped, galvanized

  • Insulated Floor System:

  • Engineered Wood I Joist

  • Joist Hanger - Simpson top flange hanger

  • Fasteners - Hot-dipped, galvanized

  • 6-1/2” SIP Panel

  • Screw - 8” SIP coated screw w/drivers

  • Lumber – 2”X 6” SPF #2 & better

FLOOR SYSTEM:

CHOICE of SIDING, SOFFIT, and TRIM:

  1. LP SmartSide Primed 7/16” OSB Soffit and T1-11 Siding, Cedar Trim

  2. LP SmartSide Pre-Painted 7/16” OSB Soffit and T1-11 Siding, Cedar Trim

  3. CertainTeed Vinyl Siding, Soffit, and Trim

  4. Plywood T1-11

CHOICE of INTERIOR FINISH:

WALLS:

  1. Interior - 3/8 inch pre-finished plywood paneling (Honey Oak)

  2. Bath Room Only– White Fiberglass Reinforced Plastic (RFP)

  3. Drywall (1/2" sheetrock)

CEILING:

  1. 1/2” AC Plywood

  2. Drywall (5/8” X sheetrock)

FLOOR:​​

  • 3/8” Plywood underlayment

  1. Resilient 12”x12” glue down floor tile (Warm Beige)

  2. Mannington Adura Lock Solid Plank (4”x36”)